← Factovare Blog
ERP

Manufacturing ERP Requirements Checklist Before You Select Software

Practical manufacturing software knowledge for ERP, MES, MRP, factory planning, shopfloor execution and connected decision-making.

By Factovare2026-06-278 min read

A manufacturing ERP requirements checklist helps factories select software based on actual needs instead of assumptions. Without a checklist, ERP selection can become confusing because every vendor will present their software as complete.

The checklist should be created before vendor discussions. It should include current problems, required modules, process gaps, reporting needs, users, approvals and integration expectations.

Master data requirements

Check whether the ERP can manage item master, customer master, supplier master, product master, BOM, units of measurement, process routes, work centers and tax or finance masters. Poor master data control can damage the entire ERP implementation.

Inventory and stores requirements

The ERP should support stock receipt, issue, transfer, adjustment, physical stock verification, batch or lot tracking, minimum stock, reorder point and inventory valuation. Inventory accuracy is one of the biggest success factors in manufacturing ERP.

Production planning requirements

Check whether the ERP can convert demand into production plans, generate material requirements, release work orders and show pending production. If the factory needs capacity-based planning, confirm whether the ERP can handle machine and manpower constraints.

BOM and MRP requirements

The ERP should support multi-level BOM, alternate materials, scrap allowance, revision control and material requirement calculation. MRP output is only reliable when BOM and inventory are accurate.

Costing requirements

Manufacturing costing should include material cost, labour cost, machine cost, overhead, rejection, rework and operation cost. If the ERP cannot calculate realistic cost, profitability decisions may become weak.

Reporting requirements

Ask for reports related to inventory ageing, order status, purchase pending, production pending, material shortage, customer delivery, cost variance and quality rejection. Reports should support decisions, not only data export.

How Factovare helps

Factovare is being built around practical factory decision-making. A requirements checklist becomes stronger when it considers how factory data will flow between planning, production, inventory, quality and costing.

Conclusion

ERP selection should start with requirements, not vendor names. A good checklist helps the factory protect itself from wrong software selection and weak implementation.

Factovare

Build a connected factory system

Connect planning, production, manpower, material, quality, maintenance and costing data in one factory platform.

Contact Us for DemoView More Articles

Frequently Asked Questions

Why is an ERP requirements checklist important?

It helps factories compare ERP systems based on real needs such as BOM, inventory, production planning, costing and reporting instead of only demo presentation.

What are the most important ERP requirements for manufacturing?

The most important requirements are item master, BOM, inventory, purchase, production planning, MRP, costing, quality and management reporting.

Should ERP requirements be prepared before vendor demo?

Yes. Requirements should be prepared before vendor demo so the factory can ask the right questions and test the real workflow.